Rubber Kneader
Deliver a high-quality machine as promised. Each one has passed strict testing to ensure our machine in perfect working condition.
2.Transport package:
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
3.Delivery date:
There are available machine in our factory and customized machine according to your request. Available machine can be delivering ASAP. Customized machine from designing to completion will cost 25-35 days normally.
4.Installation and commissioning overseas
Overseas service and technical support can be supplied but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days, large machine usually takes about 30 days.
5.Visit:
Our company is located in Qingdao City, Shandong province, China. The name of airport is QingdaoLiuting airport. Please contact us in advance and we will pick you up at the airport.
Type | X(S)N-35L | X(S)N-55L | X(S)N-75L | X(S)N-110L |
Total volume of mixing chamber (L) | 75 | 125 | 180 | 250 |
Working volume of mixing chamber (L) | 35 | 55 | 75 | 110 |
Rotational speed of the rotor(front) (r/min) | 36 | 36 | 36 | 30 |
Rotational speed of the rotor(rear) (r/min) | 30 | 30 | 30 | 24.5 |
Driving motor power (KW) | 55 | 75 | 110 | 185 |
Tilting angle | 110° | 110° | 110° | 110° |
Size: Length× Width× Height | 3150× 1900× 2880 | 3280× 2120× 3090 | 3250× 2120× 3250 | 4075× 2712× 3580 |
FAQ
1.Quality :
Quality guarantee: One year. Deliver a high-quality machine as promised. Each one has passed strict testing to ensure our machine in perfect working condition.
2.Transport package:
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
3.Delivery date:
There are available machine in our factory and customized machine according to your request. Available machine can be delivering ASAP. Customized machine from designing to completion will cost 25-35 days normally.
4.Installation and commissioning overseas
Overseas service and technical support can be supplied but customer needs to pay for the cost of the installation. Small machine usually takes within 2~3 days, large machine usually takes about 30 days.
5.Visit:
Our company is located in Qingdao City, Shandong province, China. The name of airport is QingdaoLiuting airport. Please contact us in advance and we will pick you up at the airport.
Any question or for further information, please contact us
Meanwhile, welcome to visit our factory!
Meanwhile, welcome to visit our factory!